5-ton system through an attic full of beams
The attic had so many cross-beams that the equipment looked impossible to get in. The crew worked it through like a sliding puzzle and finished a job planned for two days in one. The install included an air purification system with a UV lamp and ionizer.
More of our work in Chino Hills
See all 12Two systems replaced
Two complete systems replaced in Chino Hills. Both installed, commissioned and running normally.
AC installed 2 years ago — after a new electrical panel, the tenant said no cooling. The electrician blamed the AC. We pulled out thermal imaging and found the real issue immediately. No guessing, no assumptions.
2,400 sq ft home with a poorly designed 5-zone duct system — every zone was uncomfortable and couldn't cool down even after running all day. We redesigned the ductwork and installed a new AC system. The homeowner felt the difference immediately.